Assessment
Reliability Maturity Assessment
Ten questions, one for each core maintenance and reliability discipline. Score each honestly on how it actually runs today, not how it's supposed to run. It takes about five minutes.
0 of 10 answered
What to do with your score
There is no shame in a low score. The only mistake is knowing the real number and writing down a different one. A low score just tells you where to focus first — trying to fix every discipline at once is the most common way reliability transformations stall. Pick your two lowest-scoring disciplines, stabilize them, prove the value, then move to the next two.
Related Knowledge Library topics
Asset Criticality Analysis · Preventive Maintenance · Condition Monitoring & Predictive Maintenance · Precision Maintenance · Maintenance Scheduling · Maintenance Materials Management · CMMS Fundamentals · Root Cause Analysis (RCA) · Maintenance KPIs
These topics are in progress in the Knowledge Library and are not all publicly available yet.
Benchmark reference
These ranges are widely referenced across SMRP Best Practices, ISO 14224, and JIPM TPM Award criteria, generalized here as directional benchmarks, not a specific documented study. Individual industries and asset types vary; use these to gauge direction, not as a precise target for every operation.
Asset & Work Performance
| Metric | Average | Good | Leading |
|---|---|---|---|
| Overall Equipment Effectiveness (OEE) | 55–65% | 70–80% | ≥ 85% |
| Asset availability (critical assets) | 85–90% | 92–95% | ≥ 97% |
| Reactive work % | 50–70% | 25–35% | ≤ 20% |
| Planned work % | 30–40% | 60–70% | ≥ 80% |
| Schedule compliance | 40–60% | 70–80% | ≥ 90% |
| Wrench time | 25–35% | 40–50% | ≥ 55% |
| PM compliance | 60–80% | 85–92% | ≥ 95% |
| First-time-fix rate | 50–65% | 75–85% | ≥ 90% |
Data Quality, Spares & Cost
| Metric | Average | Good | Leading |
|---|---|---|---|
| Failure-code completeness | 30–60% | 75–90% | ≥ 95% |
| Inventory accuracy | 75–85% | 92–95% | ≥ 98% |
| Stockout rate on critical spares | 5–10% | 1–2% | ≤ 0.5% |
| Maintenance cost as % of replacement asset value | 4–6% | 2.5–3.5% | ≤ 2.5% |
| RCA corrective-action close-on-time | 40–60% | 75–85% | ≥ 90% |
Safety & People
| Metric | Average | Good | Leading |
|---|---|---|---|
| Maintenance employee turnover | 12–18% | 8–10% | ≤ 6% |
| Technician certification currency | 60–80% | 90–95% | ≥ 98% |